Goetz Tower Project

 Post Reply Post Reply Page  <12
Author
Analytical View Drop Down
MUSA Citizen
MUSA Citizen


Joined: Nov 19 2015
Location: United States
Status: Offline
Points: 562
Post Options Post Options   Thanks (0) Thanks(0)   Quote Analytical Quote  Post ReplyReply Direct Link To This Post Posted: Feb 08 2017 at 1:17pm
It's heart-warming to know that you are so "in the loop" with taxpayer funded activities.  Maybe you are much closer to the operations of One Donham Plaza than we realize?  And, by the way, I did not say that Mr. Coon spent the $300,000.  Thanks for the clarification.
Back to Top
swohio75 View Drop Down
MUSA Citizen
MUSA Citizen


Joined: Jun 13 2008
Status: Offline
Points: 820
Post Options Post Options   Thanks (0) Thanks(0)   Quote swohio75 Quote  Post ReplyReply Direct Link To This Post Posted: Feb 08 2017 at 12:15pm
Originally posted by Analytical Analytical wrote:

Insofar as the Rose Furniture deal is concerned, does the word "CONVOLUTED" describe the city's role since 2013?  Are the taxpayers to understand that Mr. Coon will now receive the $300,000 promised earlier to Mr. Robinette?  May these funds also be co-mingled with the Goetz Tower deal?  A straight-forward response is requested?
Steve Coon has been part of this project since the beginning if you were to go back and review city council meeting minutes.  

The $300,000 received was to:

- Repair the roof at Rose (which collapsed prior to work being able to begin)
- Acquire the property at 44 Main and make repairs.  This property had been damaged by the Rose roof issue.  The property was acquired by Historic Rose LLC on 10/8/2013 for $125,000.  It has subsequently been sold (8/31/2016) for $148,000

The roof at Rose collapsed prior to Coon and his group being able to address the issue.  Council at the time postponed the initial vote by two weeks, and Coon warned Council about  the risk in doing so.  

I think it's pretty unfair to Coon to say that he hasn't used the money provided to him wisely.  There was a tremendous amount of work that need to be done after the roof collapsed 




Back to Top
Douglas Adkins View Drop Down
MUSA Resident
MUSA Resident


Joined: Aug 22 2016
Status: Offline
Points: 94
Post Options Post Options   Thanks (0) Thanks(0)   Quote Douglas Adkins Quote  Post ReplyReply Direct Link To This Post Posted: Feb 08 2017 at 7:53am
Vivian and Nelson,

I'm happy to spend some time here answering questions and trying to explain what we are doing and why. I don't have time, however, to answer the same questions over and over. I have a very difficult city to run and my mother's health is failing and caring for her takes up a lot of the rest of my time.

Mike is out of the Goetz deal and has no business association with Steve Coon's group any more. You'll just have to believe me or not. I don't have time to look for officer documents.

I'm willing to spend some more time on the Rose Furniture deal, but it probably won't be until next week sometime. I will respond more then.
Back to Top
Vivian Moon View Drop Down
MUSA Council
MUSA Council


Joined: May 16 2008
Location: Middletown, Ohi
Status: Offline
Points: 4187
Post Options Post Options   Thanks (0) Thanks(0)   Quote Vivian Moon Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 8:20pm
Doug
None of the documents in the workbook name the new officers of Historic Goetz Tower LLC.
Back to Top
Analytical View Drop Down
MUSA Citizen
MUSA Citizen


Joined: Nov 19 2015
Location: United States
Status: Offline
Points: 562
Post Options Post Options   Thanks (0) Thanks(0)   Quote Analytical Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 5:02pm
Once again, does Mr. Coon receive the $300,000 previously allocated to Mr. Robinette for the Rose Furniture deal?  If so, will Mr. Coon be able to utilize some or all of said funds for the Goetz Tower deal Mr. Akins?
Back to Top
Analytical View Drop Down
MUSA Citizen
MUSA Citizen


Joined: Nov 19 2015
Location: United States
Status: Offline
Points: 562
Post Options Post Options   Thanks (0) Thanks(0)   Quote Analytical Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 1:12pm
Insofar as the Rose Furniture deal is concerned, does the word "CONVOLUTED" describe the city's role since 2013?  Are the taxpayers to understand that Mr. Coon will now receive the $300,000 promised earlier to Mr. Robinette?  May these funds also be co-mingled with the Goetz Tower deal?  A straight-forward response is requested?
Back to Top
Douglas Adkins View Drop Down
MUSA Resident
MUSA Resident


Joined: Aug 22 2016
Status: Offline
Points: 94
Post Options Post Options   Thanks (0) Thanks(0)   Quote Douglas Adkins Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 12:17pm
Historic Goetz Tower, LLC is still the owner. Mike no longer has an interest in HGT and Grass Roots Ohio no longer is involved in the project.
Back to Top
whistlersmom View Drop Down
MUSA Citizen
MUSA Citizen
Avatar

Joined: Mar 11 2016
Status: Offline
Points: 722
Post Options Post Options   Thanks (0) Thanks(0)   Quote whistlersmom Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 12:14pm
Douglas Adkins posted this on Jan. 20, 2017 at 8:56 am under “Manchester Inn sold”

“Rose Furniture will be rebuilt as part of the Goetz Tower project with retail first floor and upper level apartments. Took a long time but it will get done.”

John, I wouldn’t hold my breath waiting for Rose Furniture to be completed. The now deteriorated condition of the structure is obvious. Just stand by a window on the sidewalk and look up inside – you will see the sky due to the roof having fallen to street level. In 2013, we were lead to believe that Robinette was “given” Rose Furniture plus $300,000 to fix the roof. Nothing has been done. Now that Robinette is no longer a part of this project we want to be assured that the $300K is still present and accounted for to be used for its intended purpose by the Steve Koon’s group. How much has the delay added to the cost of rebuilding? Why didn’t (shouldn’t) the city have a contract requiring start and completion dates? No urgency here! Is Koon,s group out of funds? How can that be when little or nothing has been done to refurbish the propeties they received for little or nothing. Is that the reason the city had to lease the first floor of the Goetz Tower? What else can we give away and subsidize?

After the Rose Furniture debacle, why does the city continue to favor the Koon’s group over any others who might want to make a real contribution to their revitalization plans?
Back to Top
Vivian Moon View Drop Down
MUSA Council
MUSA Council


Joined: May 16 2008
Location: Middletown, Ohi
Status: Offline
Points: 4187
Post Options Post Options   Thanks (0) Thanks(0)   Quote Vivian Moon Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 12:03pm
Doug
Who is the new owner of the Goestz Tower and when did the transfer take place?
Back to Top
Douglas Adkins View Drop Down
MUSA Resident
MUSA Resident


Joined: Aug 22 2016
Status: Offline
Points: 94
Post Options Post Options   Thanks (0) Thanks(0)   Quote Douglas Adkins Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 11:48am
He was in 2014. He is not now.   That's why the legislation is being presented to clean up the ownership in the CRA agreement.
Back to Top
Vivian Moon View Drop Down
MUSA Council
MUSA Council


Joined: May 16 2008
Location: Middletown, Ohi
Status: Offline
Points: 4187
Post Options Post Options   Thanks (0) Thanks(0)   Quote Vivian Moon Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 11:48am
In the council workbook this property is listed as being located at 1000 Central Ave....however auditor page it is listed as 11S Main Street ??????

PARID: Q6511005000049
HISTORIC GOETZ TOWER LLC11 S MAIN ST

TaxyrLand ValueBuilding ValueTotal Appraised ValueLand (35%)Building (35%)35% Total AssessedCAUV
2016$12,600$146,970$159,570$4,410$51,440$55,850$0
2015$12,600$146,970$159,570$4,410$51,440$55,850$0
2014$12,600$146,970$159,570$4,410$51,440$55,850$0

Back to Top
Vivian Moon View Drop Down
MUSA Council
MUSA Council


Joined: May 16 2008
Location: Middletown, Ohi
Status: Offline
Points: 4187
Post Options Post Options   Thanks (0) Thanks(0)   Quote Vivian Moon Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 11:44am

LEGISLATION

1. Ordinance No. O2017-02, an ordinance authorizing an amendment to the Community Reinvestment Area Agreement between City of Middletown, Historic Goetz Tower, LLC and Grassroots Ohio, LLC. (Second Reading)

 As of 9-24-2014 Mike Robinette was president of both Grassroots Ohio LLC and Historic Goetz Tower LLC when the transfer took place. Copies are available in this weeks council workbook.

http://www.cityofmiddletown.org/docs/council/02072017_w.pdf

Back to Top
Douglas Adkins View Drop Down
MUSA Resident
MUSA Resident


Joined: Aug 22 2016
Status: Offline
Points: 94
Post Options Post Options   Thanks (0) Thanks(0)   Quote Douglas Adkins Quote  Post ReplyReply Direct Link To This Post Posted: Feb 07 2017 at 8:25am
Mike is no longer associated with Steve Coon's group and does not have an interest in either Goetz or Rose Furniture anymore.
Back to Top
John Beagle View Drop Down
MUSA Official
MUSA Official
Avatar

Joined: Apr 23 2007
Location: Middletown
Status: Offline
Points: 1855
Post Options Post Options   Thanks (0) Thanks(0)   Quote John Beagle Quote  Post ReplyReply Direct Link To This Post Posted: Feb 05 2017 at 1:11pm
I would love to have more current information about these two projects.
John Beagle

Middletown USA

News of, for and by the people of Middletown, Ohio.
Back to Top
John Beagle View Drop Down
MUSA Official
MUSA Official
Avatar

Joined: Apr 23 2007
Location: Middletown
Status: Offline
Points: 1855
Post Options Post Options   Thanks (0) Thanks(0)   Quote John Beagle Quote  Post ReplyReply Direct Link To This Post Posted: Feb 05 2017 at 1:07pm


Background on Goetz Tower Project

State Historic Tax Credit Expected to Boost $3.1M Renovation of Goetz Tower

BY DAVID A. EMERY ― 

The seven-story Middletown Building & Deposit Association tower in Butler County was one of 12 projects in southwest Ohio to receive historic tax credits last month from the State of Ohio. As part of the deal, the $3.1 million project will receive $600,000.

http://www.urbancincy.com/tag/goetz-tower/

John Beagle

Middletown USA

News of, for and by the people of Middletown, Ohio.
Back to Top
Analytical View Drop Down
MUSA Citizen
MUSA Citizen


Joined: Nov 19 2015
Location: United States
Status: Offline
Points: 562
Post Options Post Options   Thanks (0) Thanks(0)   Quote Analytical Quote  Post ReplyReply Direct Link To This Post Posted: Feb 04 2017 at 6:36pm
In addition to the Liberty Spirits deal, Is it also accurate that Mike Robinette is still one of the principals of the pending Goetz Tower project?  Also, does he have a piece of the Rose Furniture or other potential "downtown" undertakings?
Back to Top
 Post Reply Post Reply Page  <12
  Share Topic   