Home | Yearly News Archive | Advertisers | Blog | Contact Us |
|
Saturday, November 23, 2024 |
|
SunCoke |
Post Reply |
Author | |
409
Prominent MUSA Citizen Joined: Mar 27 2009 Status: Offline Points: 1014 |
Post Options
Thanks(0)
Posted: Jun 06 2011 at 11:26pm |
Construction is moving along.......
|
|
SupportMiddletown
MUSA Resident Joined: Nov 01 2009 Status: Offline Points: 181 |
Post Options
Thanks(0)
|
Wow, those are impressive images. Looks like industry in Europe or something.
|
|
LMAO
MUSA Citizen Joined: Oct 28 2009 Location: Middletucky Status: Offline Points: 468 |
Post Options
Thanks(0)
|
Just another pollution maker. Wonder how are "SPINELESS" council would feel if this was in their backyard or behinde there kids school? Oh damn,brain fart what was I thinking,they dont care.Just as long as the good Mayor doesnt piss his golfing buddies off at AK Stinkhole things will be fine.
|
|
409
Prominent MUSA Citizen Joined: Mar 27 2009 Status: Offline Points: 1014 |
Post Options
Thanks(0)
|
The view of the south side is getting more obsure with the installation of the exit conveyor.
The conveyor tube at the right of the second image crosses over Yankee Rd.
They must be getting ready to heat up, dry out, pressure test,etc. with the arrival of a portable boiler.
A view of the north side from Yankee Rd.
|
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
This page was generated in 0.100 seconds.
Copyright ©2024 MiddletownUSA.com | Privacy Statement | Terms of Use | Site by Xponex Media | Advertising Information |